Which of the following strategies are used in SSM?
a) peak time shifts are used to meet periods of high demand.
b) longer shifts (e.g., 24-hour shifts) are used to provide coverage.
c) ambulances working shorter shifts are assigned the maximum number of calls possible.
d) all of the above .



Answer :

Answer:

I don't know what to do with the best way to get the book for me and I

Other Questions